
The Village’s 2021 Road Reconstruction and Road Resurfacing programs were recently approved by the Village and are work is scheduled to begin soon. Improvements will be done on over 7.5 miles of streets once the work concludes later this summer.
Want to learn of more impressive improvement programs going on this year throughout the Village, from stormwater projects to roadway improvements?
Streets Listed in Reconstruction & Rehabilitation Program
There are 16 different segments of streets in the Village that have been selected for the Reconstruction and Rehabilitation program. The selection is based on streets being at a stage of deterioration where the curb and gutter is no longer functioning properly, there is failure of the street's subbase and the main part of the street is in poor condition.
On April 5, 2021, the Village Board awarded a contract for $3,990,700.00 to J.A. Johnson Paving Company for the 2021 MFT Street Reconstruction Program. This work is funded by the Village’s share of the State’s Motor Fuel Taxes (MFT) and the REBUILD Illinois Bond Grant Funds. The Project Engineer for the Street Rehabilitation & Reconstruction Program is Briget Schwab.
Streets Listed in Resurfacing Program
Village streets selected for the resurfacing program are those that are in the beginning stages of deterioration. This maintenance program, which involves more streets than Rehabilitation & Reconstruction, is intended to extend the life of the street. Intermittent curb and sidewalk are removed and replaced and the street is milled and resurfaced. This year's program includes 5 miles of asphalt pavement which will performed by Arrow Road Construction per a bid awarded by the Village Board on April 19, 2021 for $2.2 million. The Project Engineer for the Street Resurfacing Program is Aldair Vargas.
STREETS |
LIMITS |
Belmont Ave |
Rockwell St to Orchard St |
Bristol Ln |
Rockwell St to Orchard St |
Burton Pl |
Rockwell St to Central Rd |
Crabtree Dr |
Waverly Dr to Waterman Ave |
Donald Ave |
Grove St to Gregory St |
Dunton Ave |
Sigwalt St to South Dead End |
Evergreen Ave |
Campbell St to Sigwalt St |
Forrest Ln |
Suffield Dr to Peachtree Dr |
Harvard Ave |
Oakton St to Northwest Highway |
Magnolia St |
Fernandez Ave. to West Dead End |
Orchard St |
Arlington Heights Rd to Beverly Ln |
Peachtree Dr |
Forrest Ln to Waterman Ave |
Salem Ln |
Magnolia St to White Oak St |
Talbot St |
Hickory Ave to Dryden Ave |
Waverly Ln |
Forrest Ln to Waterman Ave |
Yale Ave |
Kirchoff Rd to Cul-de-sac |
Forrest Ave |
Kensington Rd to Northwest Highway |
Orchard Pl |
New Wilke Rd to S Dwyer Ave |
Carlyle Pl |
Windsor Rd to Palatine Frontage Rd |