Street Reconstruction and Rehabilitation

Last Updated November 22, 2022

LOCATION 1
HAVEN DRIVE from PRINCETON AVE to KASPAR AVE
KENNICOTT AVENUE from HARVARD AVE to HAVEN DR
CEDAR LANE from HARVARD AVE to KASPAR AVE  

Construction is complete.  

Sod restoration was completed on September 15.  Watering the sod (up to 16 watering days in the first 30 days) to establish the root system is included in the cost of the contract.  However, we do ask for resident cooperation so the sod will flourish and additional watering is always appreciated.  Please do not cut your new sod or fertilize until the root system has been established, which is approximately 14 days.  Please cut new sod at a high height of three inches for the season.  This will help your new sod grow and stay healthy.  
Per contract specifications, after 30 days from sod installation, the Village performed a final inspection to ensure the sod has taken root and is thriving.  All areas installed in September passed the final inspection and maintenance of the parkway now reverts back to the homeowner.  


LOCATION 2
HIGHLAND AVE from CENTRAL RD to KIRCHOFF RD
CHESTNUT AVE from CENTRAL RD to KIRCHOFF RD
WALNUT AVE from CENTRAL RD to KIRCHOFF RD

Construction is complete.  

Sod restoration was completed on Chestnut Ave and Highland Ave and the east side of Walnut on September 16.  The west side of Walnut Ave will be completed on Friday, September 23.  
Per contract specifications, after 30 days from sod installation, the Village performed a final inspection to ensure the sod has taken root and is thriving.  All areas installed in September passed the final inspection and maintenance of the parkway now reverts back to the homeowner.  

Sod installation next to asphalt driveways was completed on November 10.  Due to the time of year the sod was installed, the final inspection for these locations will take place in the spring.

LOCATION 3  
EVERGREEN AVENUE from MAGNOLIA ST to CENTRAL RD
MAGNOLIA STREET from EVERGREEN AVE to W SIDE ARL HTS RD

Construction is complete.  

Sod restoration was completed on September 15.  Watering the sod (up to 16 watering days in the first 30 days) to establish the root system is included in the cost of the contract.  However, we do ask for resident cooperation so the sod will flourish and additional watering is always appreciated.  Please do not cut your new sod or fertilize until the root system has been established, which is approximately 14 days.  Please cut new sod at a high height of three inches for the season.  This will help your new sod grow and stay healthy.  

Per contract specifications, after 30 days from sod installation, the Village will perform a final inspection to ensure the sod has taken root and is thriving. Once the sod has passed final inspection, maintenance of the parkway will revert back to the homeowner.


LOCATION 4
JANE AVE from WINDSOR DR to WILSHIRE AVE
DRURY LN from LILLIAN AVE to JANE AVE
WILSHIRE AVE from JANE AVE to LILLIAN AVE
 
Construction is complete.  

Sod restoration was completed on November 10.  Watering the sod (up to 16 watering days in the first 30 days) to establish the root system is included in the cost of the contract.  However, we do ask for resident cooperation so the sod will flourish and additional watering is always appreciated.  Please do not cut your new sod or fertilize until the root system has been established, which is approximately 14 days.  Please cut new sod at a high height of three inches for the season.  This will help your new sod grow and stay healthy.  
Per contract specifications, after 30 days from sod installation, the Village will perform a final inspection to ensure the sod has taken root and is thriving. Once the sod has passed final inspection, maintenance of the parkway will revert back to the homeowner.  However, due to the time of year the sod was installed.  The final inspection will take place in the spring.

THE FOLLOWING LOCATIONS HAVE BEEN POSTONED UNTIL SPRING 2023

LOCATION 5  
CAMPBELL STREET Right of way from HICKORY AVE to BEVERLY LN

No work has been scheduled at this time.  Please check back for updates.

LOCATION 6  
LADD STREET from KENNICOTT AVE to RIDGE AVE
RIDGE AVENUE from LADD ST to TECHNY RD

No work has been scheduled at this time.  Please check back for updates.

LOCATION 7
ETON DRIVE: (including both Courts) from WINDSOR DR to STANFORD RD
STANFORD ROAD from BUFFALO GROVE RD to ETON D
R
No work has been scheduled at this time.  Please check back for updates.