Street Resurfacing

Street Resurfacing Program 

Village streets that are selected for the resurfacing program are in the beginning stages of deterioration. This maintenance program, which involves more streets than Rehabilitation & Reconstruction, is intended to extend the life of the street. Intermittent curb and sidewalk are removed and replaced and the street is milled and resurfaced. This year's program includes 7 miles of asphalt pavement which will performed by Builders Paving, LLC per a bid awarded by the Village Board on March 7, 2022 for $3.54 million. The Project Engineer for the Street Resurfacing Program is Aldair Vargas. (Map below) 

Updates will be shared below as they become available. 

Belmont Ave: Thomas St to North End
Belmont Ave: Thomas St to Olive St
Brown St: Wilke Rd to Yale Ave
Charter Point Dr: Lake Arlington Dr to Dead End
Coldspring Rd: Lake Arlington Dr to Woodbury Dr
Country Lake Rd: Charter Point Dr to Coldspring Rd
Douglas Ave: Thomas St to Maude Ave
Evergreen Ave: Grove St to Maple St
Evergreen Ave: Orchard St to South End
Fremont St: Wilke Rd to Yale Ave
Haddow Ave: Thomas St to South End
Haddow Ave: Maude Ave to Lynnwood Ave
Hawthorne St: Walnut Ave to Arlington Heights Rd
Illinois Ave: Williamsburg St to Cambridge St
Lake Arlington Dr: Palatine Frontage Rd to Schoenbeck Rd
Lynnwood Ave: Arlington Heights Rd to Douglas Ave
Lynnwood Ave: Kennicott Ave to Thomas St
Maude Ave: Arlington Heights Rd to Douglas Ave
Oakton St: Arlington Heights Rd to Kennicott Ave
Olive St: Arlington Heights Rd to Douglas Ave
Pine Ave: Maude Ave to Lynnwood Ave
Plymouth Dr: Wilke Rd to Williamsburg St
Rammer Ave: Grove St to Gregory St
Reuter Dr: Fremont St to Miner St
Richmond St: Cambridge St to Verde Dr
Woodbury Dr: Charter Point Dr to Coldspring Rd
Embers Ln: Algonquin Rd to Cedar Glen Ln

Update for Week of April 18, 2002

Embers Ln – The contractor has removed and replaced the concrete on the west side of the street. The contractor will be removing all the barricades on the west side of the street at 7am on Monday morning, so residents that live on that side are encouraged to park in their driveways moving forward. The contractor is planning to remove the concrete on the east side of the street on Monday morning so residents that live on that side should have their cars out by 7am Monday morning. The residents that will have their driveway access disturbed have been notified on Friday 4/15 with an orange notice that was left on their door.

Fremont St & Reuter Dr – On Monday morning, the barricades will be removed from the side of the street where the concrete has been poured back. The residents living on that side of the street are encouraged to park back in their driveways moving forward once the barricades have been moved.  The contractor is planning to remove the other side of the street on Monday either late morning or early afternoon. Residents that live on that side should have their cars out by 7am on Monday morning. The residents who will have their driveway access disturbed were notified on Friday 4/15.

Evergreen Ave & Rammer Ave – On late Monday morning, the barricades will be removed on the side of the street where the concrete has been poured back. The residents living on that side of the street are encouraged to park back in their driveways moving forward once the barricades have been moved. The contractor is planning to remove the other side of the street on Tuesday. Residents that live on that side of the street should have their cars out by 7 am on Tuesday morning. The residents who will have their driveway access disturbed were notified on Friday 4/15. 

Hawthorne St & Brown St – The contractor will continue to pour the concrete that was removed last week on Monday morning. The residents will be able to park back in their driveways 72 hours after the concrete has been poured back. Please continue to park on adjacent side streets until then.

Oakton St & Lynnwood Ave (Kennicott Ave to Thomas St) -  The contractor will continue to progress north with the concrete removal. These two streets will be next on the list and are tentatively scheduled for Wednesday concrete removal, weather permitting. The residents who will have their driveway access disturbed will be notified on Monday 4/18 ahead of the concrete removal.



Map of Road Resurfacing Program 2022

Click Here for Full Size Map 
resurfacing2022